DETAILS OF EO REACTORS CATALYST REPLACEMENT JOB AWARDED TO GAYATRI ENGINEERING CO. |
|
Sr No. |
Company's Name |
Company's Location |
Work Order No. |
Work Order Date |
Job Description |
Contact Person |
Main Contractor |
Remarks |
1 |
India Glycols Limited |
Kashipur, Uttranchal. |
IGL/VPG/PUR/WO/377 |
14/04/90 |
Charging of Catalyst in EO Reactor R-210. |
V.P. Garg (G.M. Purchase) (M)09810111079 |
Main Contractor |
- |
2 |
India Glycols Limited |
Kashipur, Uttranchal. |
IGL/VPG/PUR/WO/446 |
07-03-92 |
Changing of Catalyst in our Reactor R-210. |
V.P. Garg (G.M. Purchase) (M)09810111079 |
Main Contractor |
- |
3 |
SM Dyechem Ltd. |
Pune, Maharashtra |
SMD:GEC:LOI:92:307 |
21/12/92 |
EO Reactor Catalyst unloading Cleaning by Grit Blasting & Loading of catalyst, D.P. Test, in EO Reactor Tubes of EOEG Plant. |
R.Swaminathan (S.V.P.) |
Main Contractor |
- |
4 |
India Glycols Limited |
Kashipur, Uttranchal. |
IGL/VPG/PUR/WO/533 |
02-04-93 |
Changing of Catalyst in our Reactor R-210. |
V.P. Garg (G.M. Purchase) (M)09810111079 |
Main Contractor |
- |
5 |
India Glycols Limited |
Kashipur, Uttranchal. |
IGL/VPG/PUR/671 |
04-04-94 |
Changing of Catalyst in our Reactor R-210. |
V.P. Garg (G.M. Purchase) (M)09810111079 |
Main Contractor |
- |
6 |
India Glycols Limited |
Kashipur, Uttranchal. |
IGL/VPG/PUR/WO/694 |
06-09-94 |
Changing of Catalyst in our Reactor R-210. |
V.P. Garg (G.M. Purchase) (M)09810111079 |
Main Contractor |
- |
7 |
India Glycols Limited |
Kashipur, Uttranchal. |
IGL/VPG/PUR/WO/851 |
20/04/96 |
Changing of Catalyst in our Reactor R-210. |
V.P. Garg (G.M. Purchase) (M)09810111079 |
Main Contractor |
- |
8 |
National Organic Chemical Industries Ltd. |
Thane, Maharashtra |
6014123616 |
31/03/97 |
R-2101 Catalyst Change |
K.K. Bhatnagar (Vice President) (M)09970176068 |
Main Contractor |
- |
9 |
India Glycols Limited |
Kashipur, Uttranchal. |
VPG/PUR/WO/7095/98 |
31/01/98 |
Charging Catalyst in Reactor R-210 & R-110, Grit Blasting, Maintenance of Heater B-110, D-210 Column safety Valves. |
V.P. Garg (G.M. Purchase) (M)09810111079 |
Main Contractor |
- |
10 |
India Glycols Limited |
Kashipur, Uttranchal. |
WO/IGL/VPG/SD/9144 |
25/08/99 |
Charging Catalyst in Reactor R-210 & R-110, Grit Blasting, Maintenance of Distillation Columns, Heater, Control Valves & Safety Valves. |
V.P. Garg (G.M. Purchase) (M)09810111079 |
Main Contractor |
- |
11 |
National Organic Chemical Industries Ltd. |
Thane, Maharashtra |
9-081-62-3239 |
25/08/99 |
Surface Cleaning with Grit Blasting of Reactor Tubes & Catalyst Filling & DP Checking in EO Reactor R-2101. |
K.K. Bhatnagar (Vice President) (M)09970176068 |
Main Contractor |
- |
12 |
National Organic Chemical Industries Ltd. |
Thane, Maharashtra |
9-081-12-4031 |
07-09-99 |
R-2101 Bottom Cover jobs - EO / EG. |
K.K. Bhatnagar (Vice President) (M)09970176068 |
Main Contractor |
- |
13 |
India Glycols Limited |
Kashipur, Uttranchal. |
WO/IGL/VPG/SD/2001/9446 |
31/12/01 |
Charging of Catalyst in Reactor R-210, R-270, R-110, R-110A, New Grit Blasting, Maintenance of Distillation Colums, Heaters, Control Valves & Safety Valves in MEG Plant Shut down. |
V.P. Garg (G.M. Purchase) (M)09810111079 |
Main Contractor |
Two Reactors Parallel |
14 |
Indian Petrochemicals Corporation Limited |
Vadodara, Gujarat |
ES/PLG/16/EG/02/01/I |
09-10-02 |
Unloading & Loading of Catalyst for EO Reactor in EG Plant. |
Geetakrishnan (Vice President) (M)09998217095 |
Main Contractor |
- |
15 |
India Glycols Limited |
Kashipur, Uttranchal. |
WO/IGL/VPG/SD/2003/9558 |
21/03/03 |
Charging of Catalyst in Reactor R-210, R-270, R-110, R-110A, Towers, Heat Exchangers, Control Valves, Dafety Valves in MEG Plant Shut Down. |
V.P. Garg (G.M. Purchase) (M)09810111079 |
Main Contractor |
Two Reactors Parallel |
16 |
India Glycols Limited |
Kashipur, Uttranchal. |
WO/IGL/MEG-23.1/017 |
26/07/03 |
Maintenance of Reactor R-270 |
V.P. Garg (G.M. Purchase) (M)09810111079 |
Main Contractor |
- |
17 |
Indian Petrochemicals Corporation Limited |
Dahej, Gujarat |
GPC/EO-EG/2003/EOCAT-01 |
03-09-03 |
EO Reactor Catalyst unloading Cleaning by Grit Blasting & Loading of catalyst, D.P. Test, in EO Reactor Tubes of EOEG Plant. |
A.S. Jani (Asst Vice President) (M)09998808361 |
Main Contractor |
- |
18 |
Indian Petrochemicals Corporation Limited |
Nagothane, Maharashtra |
CESG/CCC/JRC-02/2K-01 |
20/09/03 |
EO Reactor Catalyst unloading Cleaning by Grit Blasting & Loading of catalyst, D.P. Test, in EO Reactor Tubes of EOEG Plant. |
N.J. Prabkakar (Asst. Vice President) (M)09970050023 |
Main Contractor |
- |
19 |
Indian Petrochemicals Corporation Limited |
Vadodara, Gujarat |
BSM/3538051 |
23/10/03 |
Maintenance job for EO Reactor in EG Plant |
Geetakrishnan (Vice President) (M)09998217095 |
Main Contractor |
- |
20 |
Indian Petrochemicals Corporation Limited |
Nagothane, Maharashtra |
NSM/3537985 |
16/01/04 |
EO Reactor Catalyst unloading Cleaning by Grit Blasting & Loading of catalyst, D.P. Test, in EO Reactor Tubes of EOEG Plant. |
N.J. Prabkakar (Asst. Vice President) (M)09970050023 |
Main Contractor |
- |
21 |
Reliance Industries Limited (NOCIL) |
Patal Ganga, Maharashtra |
PS4/3554985 |
19/07/04 |
EO Reactor Catalyst unloading Cleaning by Grit Blasting & Loading of catalyst, D.P. Test, in EO Reactor Tubes of EOEG Plant. |
K.K. Bhatnagar (Vice President) (M)09970176068 |
Main Contractor |
- |
22 |
India Glycols Limited |
Kashipur, Uttranchal. |
P/MA/SD-2004 |
29/07/04 |
Charging Catalyst in Reactor R-210, R-270. |
V.P. Garg (G.M. Purchase) (M)09810111079 |
Main Contractor |
Two Reactors Parallel |
23 |
Indian Petrochemicals Corporation Limited |
Nagothane, Maharashtra |
NSM/3537985 |
22/10/04 |
EO Reactor Catalyst unloading Cleaning by Grit Blasting & Loading of catalyst, D.P. Test, in EO Reactor Tubes of EOEG Plant. |
N.J. Prabkakar (Asst. Vice President) (M)09970050023 |
Main Contractor |
- |
24 |
India Glycols Limited |
Kashipur, Uttranchal. |
IGL/2819/MEG-91/047 |
05-11-04 |
Charging Catalyst in Reactor R-210, R-270 & R-280, Grit Blasting, Maintenance of Heater B-110, D-210 Column safety Valves. |
V.P. Garg (G.M. Purchase) (M)09810111079 |
Main Contractor |
Three Reactors Parallel |
25 |
Reliance Industries Limited (S.M. Dychem) |
Kurkumbh, Pune. |
N01/3569482 |
01-03-05 |
Charging Catalyst in Reactor R-210 & R-110, Grit Blasting, Maintenance of Heater B-110, D-210 Column safety Valves. |
K.K. Bhatnagar (Vice President) (M)09970176068 |
Main Contractor |
- |
27 |
Indian Petrochemicals Corporation Limited |
Vadodara, Gujarat |
BSM/3571314 |
07-05-05 |
EO Reactor Catalyst unloading Cleaning by Grit Blasting & Loading of catalyst, D.P. Test, in EO Reactor Tubes of EOEG Plant. |
Geetakrishnan (Vice President) (M)09998217095 |
Main Contractor |
- |
28 |
India Glycols Limited |
Kashipur, Uttranchal. |
WO/IGL/SD/079 |
01-08-05 |
Replacement of TOP Dome Gasket for the EO Reactor R-280 & R-270. |
V.P. Garg (G.M. Purchase) (M)09810111079 |
Main Contractor |
- |
29 |
Reliance Industries Limited (S.M. Dychem) |
Kurkumbh, Pune. |
SD0/3581994 |
03-08-05 |
Catalyst Unloading, Loading of Catalyst Grit Blasting & D.P. Test in EO Reactor Tubes. |
R.C. Sharma (Vice President) (M)09867551125 |
Main Contractor |
- |
30 |
Indian Petrochemicals Corporation Limited |
Dahej, Gujarat |
GSP/3583281 |
01-09-05 |
EO Reactor Unloading of Old Catalyst, Grit Blasting, Loading of Fresh Catalyst by Template Loading in EO Reactor Tubes. |
A.S. Jani (Asst Vice President) (M)09998808361 |
Main Contractor |
- |
31 |
Indian Petrochemicals Corporation Limited |
Vadodara, Gujarat |
BSM/3589055 |
18/11/05 |
Replacement of Bottom Dome Gasket for the EO Reactor. |
Geetakrishnan (Vice President) (M)09998217095 |
Main Contractor |
- |
32 |
Reliance Industries Limited (S.M. Dychem) |
Kurkumbh, Pune. |
SDO/3611445 |
27/09/06 |
Removal of Hard Catalyst and Dust Hardly Stucked with Tube surface and properly cleaning of Chocked Tubes for the EO Reactor. |
K.K. Bhatnagar (Vice President) (M)09970176068 |
Main Contractor |
- |
33 |
India Glycols Limited |
Kashipur, Uttranchal. |
J/M/347/06-07 |
17/01/07 |
Charging Catalyst in Reactor R-210, R-270 & R-280, Grit Blasting, Maintenance of Exchangers & Safety & Control Valves & Revamping of Columns. |
V.P. Garg (G.M. Purchase) (M)09810111079 |
Main Contractor |
Three Reactors Parallel |
34 |
Reliance Industries Ltd. |
Kurkumbh, Pune. |
SDO/3638693 |
05-09-07 |
Unloading of Catalyst, Grit Blasting, Swab Blowing, Spring Insertion, Loading of Fresh Catalyst & Diffrential Pressure Checking. |
N.J. Prabkakar (Asst. Vice President) (M)09970050023 |
Job carried out by us under our sister concern M/s. Aarti Catalyst Solutions Pvt. Ltd. |
- |
35 |
Reliance Industries Ltd. |
Dahej, Gujarat |
GSM/3640144 I |
23/09/07 |
Unloading of old Catalyst, Loading of New Catalyst & other allied activities connected to EO Reactor. Cleaning of all EO Reactor tubes ID by Grit Blasting and along with connected activities. |
Milan Chatopadhyay (Vice President) (M)09998984765 |
Job carried out by us under our sister concern M/s. Aarti Catalyst Solutions Pvt. Ltd. |
- |
35 |
India Glycols Limited |
Kashipur, Uttranchal. |
J/M/08/08-09 |
04-08-08 |
Charging Catalyst in Reactor R-210, R-270 & R-280, Grit Blasting, Maintenance of Exchangers & Safety & Control Valves & Revamping of Columns. |
V.P. Garg (G.M. Purchase) (M)09810111079 |
Main Contractor |
Three Reactors Parallel |
|
|
|
|
DETAILS OF COLUMN REVAMPING JOB AWARDED TO GAYATRI ENGINEERING CO. |
|
Sr No. |
Company's Name |
Company's Location |
Work Order No. |
Work Order Date |
Job Description |
Contact Person |
Main Contractor |
1 |
Reliance Industries Limited |
Hazira Mfg. Division |
CC/J/5066 |
29-Sep-98 |
Column C-510 (Cracker Plant) dismantling & removal of 53 Nos. of Sieve Trays, Cutting of Bolting Bar of Tray 23 to 75, Mock up assembly of Tray panels, Installation of Nye tray panels & finally boxed up after inspection. |
(L. Santhanam) Vice President (P & C) |
Main Contractor |
2 |
Reliance Industries Limited |
Hazira Mfg. Division |
CC/J/8150 |
19-Sep-00 |
Column C-210 (Cracker Plant) Quench Oil Tower Ripple trays 1 to 24 opening, Cleaning of Trays, Supporting Structure, Repairing of damaged trays & re-intalled the same and finally boxed-up after inspection. |
(L. Santhanam) Vice President (P & C) |
Main Contractor |
3 |
Reliance Industries Limited |
Hazira Mfg. Division |
CC/J/W/6181 |
19-Feb-01 |
Column D2-601 (PTA II Plat).Structure packing Removal & Replacement, Liquid distributor removal & replacement after leveling using Theodolite in all beds, Finally boxed-up after inspection. |
(L. Santhanam) Vice President (P & C) |
Main Contractor |
4 |
Reliance Industries Limited |
Hazira Mfg. Division |
HS5/3512854 |
12-Nov-01 |
Column C-510 (Cracker Plant) Tray 1 to 22 cleaning, Replacement of Chimney Tray, Removal ot Tray 23 to 40, Argon welding of Seal pan with seal pan support ring, Tray 41 to 75 dismantling & Installation of down comers with modified panels of tray & finally boxed up after inspection. |
(L. Santhanam) Vice President (P & C) |
Main Contractor |
5 |
Reliance Industries Limited |
Hazira Mfg. Division |
HS5/3512857 |
12-Nov-01 |
Column C-210 (Cracker Plant) Quench Oil Tower Ripple trays 1 to 24 opening, Cleaning of Trays, Supporting Structure, Replacement of Tray 1 to 4 and 15 to 24 & finally boxed-up after inspection. |
(L. Santhanam) Vice President (P & C) |
Main Contractor |
6 |
Reliance Industries Limited |
Hazira Mfg. Division |
HS5/3513298 |
29-Nov-01 |
Column C-340 (Cracker Plant) Tray 1 to 40 Removal & cleaning, Replacement of Demister & Tray / Beam repaired as instructed by the Engineer Incharge & finally boxed up after inspection. |
(L. Santhanam) Vice President (P & C) |
Main Contractor |
7 |
KOCH-Glistch India Ltd. |
India Glycols Ltd. |
L/PROJ/KG-1416/IGL/01 |
2-Apr-03 |
Modification job of T-210, T-270, T-320, T2410, T-410, T-2430, T-430, T-2510, T-510, T-770, T-531, T-532, T-533, T-430 & T-510. Installation of Support Plate, Cutting of TSR & Bolting Bar, Welding of TSR Strips, Liquid Feed Inlet modification, Seal welding of Chimney Collector, Pipe modification, provision of new Handhole with RF Pads etc. |
Chirag Solanki (Manager Projects) |
Sub Contractor |
8 |
Reliance Industries Limited |
Hazira Mfg. Division |
HS5/3530477 |
5-May-03 |
HCL Column (VCM Plant) dismantling & removal of 55 Nos. of Trays, Mock up assembly of 55 Nos. of NEW Trays, Installation of NEW trays & finally boxed up after inspection. |
(L. Santhanam) Vice President (P & C) |
Main Contractor |
9 |
Reliance Industries Limited |
Hazira Mfg. Division |
HS5/3559800 |
8-Jan-04 |
HCM Column (VCM Plant) Column Tray Modification job. Dismantling & removal of 45 Nos. of Trays, Modification of Down comer of Trays 9 to 45 as per drawing, Mock up assembly of 45 Nos. of NEW Trays, Installation of NEW trays & finally boxed up after inspection. |
(L. Santhanam) Vice President (P & C) |
Main Contractor |
10 |
India Glycols Limited |
Kashipur, Uttranchal. |
WO/IGL/2819/MEG-91/047 |
5-Nov-04 |
Modification job for Tower T-1410, TSR Fabricated from Plates, Fabrication of Nozzle & reinforcement pad, All nozzle Hydrotested from inside (Box Test) etc. |
V.P. Garg (G.M. Purchase) (M)09810111079 |
Main Contractor |
11 |
India Glycols Limited |
Kashipur, Uttranchal. |
WO/IGL/2819/MEG-91/047A |
25-May-05 |
Fabrication & Erection of CS & SS Piping job, 27 Nos. of Equipments modification jobs for project, Erection of IBR Pipeline, Erection of Valves, Cutting & welding of New Heater Coils etc. |
V.P. Garg (G.M. Purchase) (M)09810111079 |
Main Contractor |
12 |
Reliance Industries Limited |
Hazira Mfg. Division |
HS5/3601952 |
2-Aug-06 |
Column C-210 (Cracker Plant) Quench Oil Tower Ripple trays 1 to 24 opening, Cleaning of Trays, Supporting Structure, Replacement of Tray 1 to 4 and 15 to 24 & finally boxed-up after inspection. |
(Jatin S. Vakil) Vice President (P & C) |
Main Contractor |
13 |
India Glycols Limited |
Kashipur, Uttranchal. |
J/M/347/06-07 |
17-Jan-07 |
Modification of Tower Internal, Nozzle & 30" Pipe line for T-610, T-620 & D-310. |
V.P. Garg (G.M. Purchase) (M)09810111079 |
Main Contractor |
14 |
Reliance Industries Limited |
Vadodara Mfg. Division |
BSM/3614076 |
22-Mar-07 |
C-101/102 Column Cleaning job at PBR-II Plant. Activity includes Blinding, Manhole Opening, Removal of Trays & Down commer, Internal cleaning of Column and finally boxed-up the same after inspection. |
T.G. Bhavsar (Asst. Vice President) |
Main Contractor |
15 |
Reliance Industries Limited |
Vadodara Mfg. Division |
BSM/3666920 |
28-Jul-08 |
C-101/102/103 Column Cleaning job at PBR-II Plant. Activity includes Blinding, Manhole Opening, Removal of Trays & Down commer, Internal cleaning of Column and finally boxed-up the same after inspection. |
T.G. Bhavsar (Asst. Vice President) |
Main Contractor |
16 |
Reliance Industries Limited |
Jamnagar Mfg. Division |
1JJG/JS5/3668890 |
21-Aug-08 |
Reactor Internal job (RH471-R03), Opening of Manhole alongwith elbow, Installation & Alignment of Outlet collector, Installation of Tray beams, Lower Vapour liquid distribution tray, Teck weld LVLDT & Complete Welding of LVLDT, Teck welding of bolts as per drawing, Installation of Inlet diffuser etc. |
Santosh Titus (Engineer In-charge) |
Main Contractor |
17 |
Reliance Industries Limited |
Jamnagar Mfg. Division |
JS5/3683069 |
24-Feb-09 |
Column Internal job (MV-RH441-C02) Removal of all trays 1 to 36 nos. Replacemnt of valves, Straightening of Trays, beams & downcommers, Drilling of tray / beam & finally boxed-up after inspection. |
Ashok Vegda (Engineer In-charge) |
Main Contractor |
18 |
Reliance Industries Limited |
Vadodara Mfg. Division |
BSM/3691590 |
13-Jun-09 |
Maintenance of BCKR-2413504, 2413505, 24C41, 24C45 & 2413509 at BBH-GOP Plant. Activity includes Blinding, Manhole Opening, Removal of Trays & Down commer, Internal cleaning of Column and finally boxed-up the same after inspection. |
T.G. Bhavsar (Asst. Vice President) |
Main Contractor |
19 |
Reliance Industries Limited |
Hazira Mfg. Division |
HS5/31014845 |
1-Apr-10 |
Column C-210 (Cracker Plant) Quench Oil Tower Ripple trays 1 to 24 opening, Cleaning of Trays, Supporting Structure, Replacement of Tray 1 to 4 & finally boxed-up after inspection. |
(Jatin S. Vakil) Vice President (P & C) |
Main Contractor |
|
|